Building Evolutionary Architectures

Errata for Building Evolutionary Architectures

Submit your own errata for this product.


The errata list is a list of errors and their corrections that were found after the product was released.

The following errata were submitted by our customers and have not yet been approved or disproved by the author or editor. They solely represent the opinion of the customer.


Color Key: Serious Technical Mistake Minor Technical Mistake Language or formatting error Typo Question Note Update



Version Location Description Submitted By Date Submitted
Printed Page 11
6th paragraph

Final line of the next to last paragraph has " athecoordinated" should be "the coordinated"

Paul O'Sullivan  Oct 08, 2017 
Printed Page 20
Final paragraph, 4 lines up from the bottom

The word evolutionary is repeated twice: "....may have aspirations to become more evolutionary evolutionary but not yet have....."

Paul  Oct 22, 2017 
Printed Page 21
1st paragraph

".....using manuals stages in deployment pipelines ....." should read ".....using manual stages in deployment pipelines ....." i.e. manuals changes to manual.

Paul O'Sullivan  Oct 22, 2017 
Printed Page 23
2nd paragraph

Missing closing parenthesis. It should read:@ "...process metrics such as cycle time(the amount of time to move from design to implementation), .."

Paul O'Sullivan  Oct 22, 2017 
Printed Page 76
3rd paragraph

On p. 76 paragraph 3 you say "serverless baas architecture...." but I think you are still talking about service-based.

Shawn Button  Oct 19, 2017 
Mobi Page 604
Location 604 in kindle

in "...a project may have aspirations to become more evolutionary evolutionary but not yet have appropriate engineering practices in place", evolutionary is duplicated

Ricardo Cavalcanti  Nov 18, 2017 
Mobi Page 2486
Location 2486

The text says "both modules need the conflicting one shown in red", but the kindle only shows shades of grey.

Ricardo Cavalcanti  Nov 18, 2017 
Mobi Page 3253
After Figure 7-3

".. when the UI reports a Create, Read, Update, Define (CRUD) operation...", should read ".. when the UI reports a Create, Read, Update, Delete (CRUD) operation...", The D in CRUD stands for delete.

Ricardo Cavalcanti  Nov 18, 2017 
Mobi Page 3602
Inside the "Infrastructure Can Impact Architecture" box

The sentence is missing a verb: "The company a large number of servers..."

Ricardo Cavalcanti  Nov 18, 2017