June 2011
Beginner
383 pages
9h 24m
English
With the completion of the pipe network designs, the design of the road is nearly finished. It is now time to move on to the next area of the design, which is the shaping of the land, or grading, of the adjacent areas. In Chapter 9, you designed a 3D model of the road in the form of a corridor. This model will serve as a basis for much of the adjacent design that will take place such as the shaping of individual lots and grading within the stormwater management area.
Each of these areas has unique design objectives. The individual lots will be shaped so that homes can be built on them without requiring significant earthmoving. The stormwater management area will require a pond to serve as a means of collecting ...