•“Example 2: Schedule Calendar Containing Multiple Calendars” on page 210
•“Example 3: Multiple Schedule Calendars with Atypical Work Shifts (Separated
Output)” on page 214
•“Example 4: Multiple Schedule Calendars with Atypical Work Shifts (Combined and
Mixed Output)” on page 220
•“Example 8: Multiple Summary Calendars with Atypical Work Shifts (Separated
Output)” on page 241
Input Data Sets
You might need several data sets to produce a calendar, depending on the complexity of
your application. PROC CALENDAR can process one of each of four data sets, as
shown in the following table.
Table 8.4Four Possible Input Data Sets for PROC CALENDAR ...