
Chapter 4. Logical configuration performance considerations 115
R20 - Unassigned Normal A20 6 - - fb 763 - -
R21 - Unassigned Normal A21 6 - - fb 763 - -
R22 - Unassigned Normal A22 6 - - fb 763 - -
R23 - Unassigned Normal A23 6 - - fb 763 - -
4.8 Planning extent pools
After planning the arrays and the ranks, the next step is to plan the extent pools, which means
taking the planned ranks and defining their assignment to extent pools and rank groups,
including planning the extent pool IDs.
Extent pools are automatically numbered with system-generated IDs starting with P0, P1, and
P2 in the sequence in which they are created. Extent pools that ...