April 2016
Intermediate to advanced
183 pages
3h 45m
English
![]()
![]()
Table 1.1 Planning and Engineering Task
Table 4.1 High Failure Rate for Released Software
Table 5.1 Software Design Tools
Table 6.1 Configuration Management Tools
Table 6.2 ClearCase—UCM Roles and Responsibilities
Table 8.1 Key Measurement Points
Table 10.1 Configuration Baseline
Table 10.2 PCA Entry Checklist