Chapter 4. Tivoli Workload Scheduler V8.3: Migration 197
4.5.1 Upgrading a master domain manager
This section describes how to upgrade a master domain manager on AIX
v.5.3.0.0 system.
You can upgrade a master domain manager using the following installation
methods:
򐂰 “Upgrading the master domain manager using the ISMP”, as described in the
following section
򐂰 “Upgrading the master domain manager using a silent installation” on
page 213
Upgrading the master domain manager using the ISMP
During the upgrade procedure, the installation wizard backs up all the master
domain manager data and configuration information, installs the new product
code, and automatically dumps previous scheduling data and configuration
information.
To upgrade a master domain manager using the installation wizard, perform the
following steps:
1. Insert the installation CD related to the operating system.
2. Run the setup for the operating system on which you are upgrading:
On Windows operating systems:
WINDOWS\SETUP.exe
On UNIX and Linux operating systems (see Example 4-66):
SETUP.bin
Example 4-66 Running the SETUP.bin command
# /cdrom/AIX/SETUP.bin
Note: If the upgrade procedure is successful, it is not possible to roll back to
the previous version. Rollback is only possible for upgrades that fail.
198 Getting Started with IBM Tivoli Workload Scheduler V8.3
3. The installation wizard is launched. Select the installation wizard language, as
shown in Figure 4-35. Click OK.
Figure 4-35 Selecting the installation wizard language
4. Read the welcome information shown in Figure 4-36 and click Next.
Figure 4-36 Welcome information
Chapter 4. Tivoli Workload Scheduler V8.3: Migration 199
5. Read and accept the license agreement shown in Figure 4-37 and click Next.
Figure 4-37 License agreement
200 Getting Started with IBM Tivoli Workload Scheduler V8.3
6. Select a previous instance of the product from the drop-down list and click
Upgrade an instance of Tivoli Workload Scheduler, as shown in
Figure 4-38. The instance can be identified by its group name. Click Next.
Figure 4-38 Previous instance and upgrading Tivoli Workload Scheduler
Chapter 4. Tivoli Workload Scheduler V8.3: Migration 201
7. When you upgrade from a Tivoli Workload Scheduler V8.1, select Master
Domain Manager, as shown in Figure 4-39. Make sure that you select the
correct type of agent, otherwise the upgrade fails. Click Next.
Figure 4-39 Type of Tivoli Workload Scheduler instance to be upgraded