3.1 DS8910F integration3.1.1 Planning the DS8910F installation and integration3.1.2 Planning for power requirements3.1.3 Planning for host connectivity3.1.4 Planning external connectivity3.1.5 Planning for safety and service3.2 Integrating the DS8910F into IBM Z entry models3.2.1 z15 model T02 and LinuxONE III model LT23.2.2 Integrating DS8910F into z15 model T02 or LinuxONE III model LT23.2.3 IBM z14 Model ZR1 and LinuxONE II Model LR13.2.4 Integrating the DS8910F into the IBM z14 ZR1 or LinuxONE II LR13.3 Integrating the DS8910F into a standard 19-inch rack3.3.1 Planning the installation into a conforming standard 19-inch rack