Collecting Data
If there is anything Daniel had learned over years of giving training, it was
the power of a step-by-step approach. He always told his young colleagues,
“Break it down into small pieces, go for the step-by-step approach and
people will digest it better. Moreover, it gives a lot of structure to the
teaching.” Training data collection was no exception to this rule. To ease
the conveyance of the knowledge, Daniel craed a step-by-step approach
that he was about to unveil to the trainees.
TASK ONE: GROUP FORMING
Daniel described the rst task:
Form groups of four people. e general rule is that each group should
include people with dierent backgrounds. When the work is done on
the shop oor, please make sure that at least one operator is included.
is is the most eective way to carry your message to the shop oor and
spread success.
One minute later, the ve groups were formed. Daniel wrote down the
names on the ipchart, and then presented the layout with the position of
each team (Figure5.1). e room that was used for training was suddenly
transformed into a T-shirt packaging factory with four workstations, one
for each group.
32  •  Implementing Standardized Work
TASK TWO: TEAM ORGANIZATION
Daniel now moved to the description of the second task:
Each team should pick an “operator.” is person will be the operator
during the simulation. You also need to designate a stopwatch keeper and
a time collector. e stopwatch keeper will read the times loud enough
for the time collector to be able to write them down on the sheet of paper
Ijust handed out to you (Figure5.2). e fourth person of the group, the
press-handler, will be in charge of the press. Why do we need a person to
be in charge of the press? e press, which is supposed to be an automated
machine, is in reality just a piece of folded cardboard. erefore, we need
somebody to make it operate like an automatic machine. Every time the
operator closes the press and pushes a factice button, the person in charge
of the press will start the stopwatch and open the press 10 seconds later to
emulate an automated operation (Figure5.3).
T-shirt Bin
(1)
T-shirt Bin
(4)
T-shirt Bin
(3)
Press
(2)
Folding Table
(2)
T-shirt Bin
(2)
Shared T-shirt storage
(1 & 2)
1
2
3
4
Shared T-shirt storage
(3 & 4)
Press
(3)
Folding Table
(3)
Folding Table
(4)
Folding Table
(1)
Press
(1)
Press
(4)
Daniel’s Table
2
3
4
1
2
2
3
4
3
4
1
1
Layout of the Room for the Simulation Training Module
FIGURE 5.1
Layout showing the position of the four teams.
Collecting Data • 33
Machine:
Realized By:
Date:
Station:
Time: Process Cycle
# Operation Element 12345678910 11 12 13 14 15 16 17 18 19 20 Mode Min Max Average
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Measured Time:
Comments: Note reason for special cause variation, material change, code change
1
6
2
7
3
8
4
9
5
10
Time Collection Sheet
1
2
3
4
5
6
7
Special Cause Time
8
9
10
Total Process Cycle Time
FIGURE 5.2
Time collection sheet.
34  •  Implementing Standardized Work
A few minutes later, all teams had picked an operator, a stopwatch
keeper, a time collector, and a press-handler. e whole group was now
ready for the third task.
TASK THREE: FACILITATOR GIVES
JOBINSTRUCTIONS FOR OPERATORS
Daniel proceeded with the description of the third task. “You have four
raw material bins lled with T-shirts. ey are positioned at the four
corners of the room (Figure5.1). You should pick a T-shirt in the closest
raw material bin.” Daniel started the demo:
Once you pick the T-shirt, you should inspect it by checking the quality
of the neckband, and the bond on the sleeve hem and the garment hem
(Figure5.4). en iron the T-shirt in the press. is automated machine
processes in 10 seconds. Once ironing is nished, fold the T-shirt and lay
it in the storage area. When you fold the T-shirt, please make sure that the
logo is visible as in the sample in my hands (Figure5.4). Now I will perform
two more runs; please observe what I am doing and ask questions when
you need to.
Start
buon
Press Made of a Folded Cardboard
1/ The operator loads the press with a t-shirt
2/ The operator closes the press and pushes the start buon
3/ After 10 seconds the press-handler opens the press
FIGURE 5.3
Description of the operation of the ironing press.

Get Implementing Standardized Work now with O’Reilly online learning.

O’Reilly members experience live online training, plus books, videos, and digital content from 200+ publishers.