Information exchanges glossary

Asset Information Model (AIM)

Model developed during Stages 5 to 7 to include all as-installed components and systems’ operational data to support the management and operation of the facility in use.

Asset Information Requirements (AIRs)

Set out the post-construction information requirements to be delivered within the AIM and any other data record, such as COBie.

Building Information Modelling (BIM) dimensions

  • 3D: Model
  • 4D: Time
  • 5D: Cost
  • 6D: Facilities management

BIM execution plan (BEP)

Plan produced to outline the project protocols, standards and procedures for managing the delivery of the Project Information.

CAD

Computer-aided design/drawing.

Common data environment (CDE)

An information management system ...