18 Finalizing the Installation

FINALIZATION AND COMMISSIONING CHECKLIST

The following steps should be taken in commissioning the system and its software. Each of these items is explained in detail following this list:

• Connect each field device to power and its digital switch as its installation is completed in the field.
• Load and commission the server and workstation operating systems.
• Set up the security system network infrastructure (primary switches, wireless nodes, servers, and workstations), get all devices communicating (backup servers will be set up later), and secure the security system information technology network.
• Load alarm/access control system primary server and workstation software and set up the access control system ...