O'Reilly logo

Kaizen and Kaizen Event Implementation by Chris A. Ortiz

Stay ahead with the world's most comprehensive technology and business learning platform.

With Safari, you learn the way you learn best. Get unlimited access to videos, live online training, learning paths, books, tutorials, and more.

Start Free Trial

No credit card required

6. Standard Work Kaizen Event

A standard work event is an industry name for the transformation of an old line into a more continuously flowing process that incorporates single-piece flow, 5S, new work standards, and time standards. Preparation for this type of kaizen event is quite different from that for a 5S kaizen event. When preparing for a 5S event alone, the kaizen steering committee must simply pick the area and load up on supplies to be placed in the supply box. Not much more is really needed. Standard work events require solid up-front planning, usually including calculation of the following:

• Effective time

• Volume requirements

• Takt time

• Process analysis

Preplanning

Effective Time

Effective time is often called touch time; ...

With Safari, you learn the way you learn best. Get unlimited access to videos, live online training, learning paths, books, interactive tutorials, and more.

Start Free Trial

No credit card required