
124 Leveraging Lean in Ancillary Hospital Services
Video Name
Summar
y
Baseline
Post
Lean
Project
ed Reduction
Reduction
%
Enter PFA Drawing Here
Operation
Total Steps
Description
Orig Sec:
Input Boundary
Min:
Output Boundary
Hours:
Av
Time / Day (in
hours)
Days
Operator
Weeks
Distance
Baseline Lean Post Lean
check:
Storage Time Transportation InspectionProcessing Time Storag e Time Transportation InspectionProcessing Time
Va %
Raw
Material
(RM)
Between
Process
Delay
(B)
Within
Process
Delay
(W)
Finished
Goods
(FG)
Time
(T)
Distance
(in feet)
Time
(I)
Non-
Value
Added
(NV)
Value
Added
(VA)
Raw
Material
(RM)
Between
Process
Delay
(B)
Lot
Delay
(L)
Within ...