15.4. Detailed design and engineering
15.4.1. Work sequence and procedures
The Contractor shall develop Project procedures to cover all aspects of the design and procurement phases of the project. These procedures shall be based on the Company's Standard procedures, modified as necessary to suit the project requirements. In case of lack of the Company's Standard procedures, the Contractor can utilize either his own or other international procedures upon approval of the Company. These procedures should include but not be limited to the following:
• Filing System.
• Document Distribution.
• Standards and Codes (Data Base).
• Engineering Symbols, Scales, and Units.
• Numbering Procedures.
• Drafting Procedures.
• Specification for Handling of the Technical ...