Strategic Development of New JIT ◾ 181
operator’s standing position will be changed. Furthermore, each standardized
work is proved within the limited production cycle time. Temporary workers
are informed of the actual work environment (operational procedure, work-
ing posture, etc.) and the workload with quantitative analysis in advance of
hiring them; this is part of their contracts.
4. e key topic of this section: logistics is investigated by conducting a TPS-
LAS-LIS logistics investigation simulation. Similar production lines are
searched for and an available and reliable information administration system
is applied. e number of equipmen ...