Chapter Fifteen

Transporting Wind Turbines

This chapter provides an analysis of the different methods of transporting and transferring personnel and wind turbines to offshore locations and highlights the most successful operations. Based on previous experience, we have listed several criteria that should be taken into consideration before deciding on the optimum solution for the operation and maintenance (O&M) strategy for a project.

Since the first commercial turbines were installed offshore in 2001 on Middelgrunden, a number of variations on the method used at that time have been put into operation. The overall approach has been to sail either a small RIB, which is an inflatable boat that can carry up to four people, or a small vessel that ...