The data shown are as follows. Continuous review, Q, system.
z | 1.41 |
---|---|
Safety Stock | 73 |
Reorder Point | 373 |
Annual Cost | $4,822.38 |
Periodic review, P, system,
Time Between Reviews, P | 4.00 Days, a checkbox marked Enter manually is selected |
---|---|
Standard Deviation of Demand During Protection Interval | 79.37 |
Safety Stock | 112 |
Average Demand During Protection Interval | 700 |
Target Inventory Level, T | 812 |
Annual Cost | $5,207.80 |