417 Enhanced Scenario-Based Method
Confidence
Level
Dollars Million
x
0.70
1
α
120 174.2
Point Protect
Estimate Scenario
PE PS
FIGURE 12.12
Program cost probability distribution for Exercise 12.4b.
protect scenario cost PS, denoted by α
PS
;thatis,
P(Cost
WBS
PS) = α
PS
a. Modify eSBM Equations 12.3 and 12.4 in terms of α
PS
instead of α.
b. Suppose a program team developed their protect scenario and esti-
mated its cost to be $174.2M. Suppose the point estimate cost for this
program is $120M. Suppose the program team assessed α
PS
= 0.70,
CV = 0.30, and that the program’s cost follows a normal distribution.
From this, derive the condence
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.
Start your free trial

You might also like

Engineering Economics of Life Cycle Cost Analysis, 2nd Edition

Engineering Economics of Life Cycle Cost Analysis, 2nd Edition

John Vail Farr, Isaac J. Faber

Publisher Resources

ISBN: 9781482219760