Skip to Main Content
Process Control Techniques for High-Volume Production
book

Process Control Techniques for High-Volume Production

by M. Kemal Atesmen
October 2016
Intermediate to advanced content levelIntermediate to advanced
149 pages
3h 17m
English
CRC Press
Content preview from Process Control Techniques for High-Volume Production

2

SHORT-TERM GAGE CAPABILITY EVALUATION FOR VARIABLES

First we have to establish that our measurement gage is in control and capable—accurate and precise—in the short term, namely in a day or at most in a week. After establishing short-term gage capability, we can extend our gage capability investigation to the long term, namely to a month or more. After verifying that our measurement gage is in control and capable in the long term, we need to keep monitoring our gage with our production line standards in fixed periods, that is, hourly, daily, or weekly, and control the chart standards’ measurements to verify continuously our gage’s in-control status.

In this chapter, I provide two examples of short-term gage capability analysis. The first example ...

Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.
Start your free trial

You might also like

Applied Process Control

Applied Process Control

Michael Mulholland
The Road to Quality Control

The Road to Quality Control

Nicholas Fisher, Yutaka Tanaka, William Woodall

Publisher Resources

ISBN: 9781315350110