CHAPTER 15PROJECT MONITORING, EVALUATION, AND CONTROL

“I claim not to have controlled events, but confess plainly that events have controlled me.”

ABRAHAM LINCOLN, 1809–1865

15.1 INTRODUCTION

The unexamined project’s progress cannot be determined without an effective control system. Regular reviews during the life of the project gauges the progress and compares progress to the planned progress to determine the status. Control is a key function for managing the process to assure the progress is satisfactory. The degree of control and frequency of reviews are dependent upon several variables such as project stability, size, complexity, priority, and importance to the enterprise.

This chapter presents a model of the generic steps in the project ...