Quantitative Risk Estimation Model ◾ 201
3. Cyber-controller system failure
4. Operator error
5. Mechanical–electrical equipment failure
6. Flooding short-circuits the guideway
7. Intrusion damages the guideway
8. Explosion within the tunnels entry and exit
9. Flash re damages the guideway
10. Rupture the maglev train or capsule, or any combination of these damages
e potential economic, environmental, and safety hazards associated with these
assets including impacts of clandestine tunnels are identied in Tables 5.4 through
5.7 based on potential events deduction. Pipeline construction, maintenance and
operation, rail systems statistics, linear induction motor technology, and historical
and experimental freight pipeline system i