130 • Soware Engineering Reviews and Audits
© 2011 by Taylor & Francis Group, LLC
similar for the PCA, to be compiled and reviewed during the audit. Aer
the PCA execution and the metrics are completed, the schedule for the
PCA nal meeting is coordinated with the customer.
PCA activities include the following:
• Verify that the “as-built” conguration correlates with “as-designed”
product conguration.
• Determine the acceptance test requirements per Quality Assurance.
• Release Engineering Changes.
• Establish the nal product baseline.
12.17 PRELIMINARY MEETINGS
Preliminary Meetings are conducted with Quality Assurance (QA),
Congu