
Second Period 405
Figure 25.7 Superph
´
enix reactor cross section (1240 MWe) at Creys
Malville, EDF—ENEL—RWE.
Therefore, during the following eight years (1970–1977), I was
intensively involved in this program in particular,
• development of major basic sodium components, measur-
ing devices and electronic & electrical equipment needed
for the envisaged experimental simulation program (elec-
tromagnetic pumps, heat exchangers, sodium purification
systems, heat-pipe technology (from cryogenic to high
temperature, 1000
◦
C), etc.;
• establishment of support laboratories for electrical, elec-
tronic measurement equipment for electrical, magnetic,
temperature,