MFESA Method Components: Architectural Workers 313
Place architectural work products under configuration control (configuration control) −
Control changes to such architectural work products (configuration control) −
Report the status of architectural baselines and configuration items (configuration sta- −
tus reporting)
Audit the identity, version, and completeness of architectural baselines (configuration −
auditing)
Risk management team. N Collaborate with the risk management team to:
Identify architectural risks −
Analyze the probability and severity of architectural risks −
Control architectural risks via mitigations and transfer of risks −
Monitor the status of architectural risks and the effectiveness of their mitigations −
Measurement and met