already joined the MEGA-Hybrid project as a PhD collaborator,
and my systems engineering activities became a core-part of
Germany’s Fraunhofer Gesellschaft for applied research in its
Institute for Wind Energy Systems, IWES.
Wind Energy Converter 1,
33 kW
Diesel Set (1), 400 kW
Wind Energy Converter 5,
33 kW
Diesel Set (5), 400 kW
.
.
.
.
.
.
Wind Energy Converter 6,
500 kW
Battery/Converter 500 kW
Load Control 500 kW
Photovoltaic Generator System,
100 kWp
Phaseshier 600 kVA
Compensation Steps
Isolated Grid
15 kV, 50 Hz
Control System
G
~
G
~
G
~
G
~
G
~
G
~
~
–
~
–
~
–
Figure 20.8Modular Systems Technology on Kythnos Island, as being
transf