The most time-consuming part of Turbine design was the
for shorter time to market it made sense to move its design to a
specialised company. The later was experienced in controllers
for photovoltaic applications. However, some negative signs of
outsourcing started showing up soon. Firstly, the design time
stated in the contract was considerably exceeded. Secondary, the
company tried to utilise control algorithm common for photovoltaic
(PV) application in the Turbine controller—“marriage ...