interacted. In Thy, the NIVE group was starting up local production
of 22 kW wind turbines. However, we were not going to use the noisy
Tvind 4.5 m blades from Økær and therefore, at the later Folkecenter,
Ian Jordan and myself embarked upon building the mould for a
wind turbine from 1957, but scaled-down.
produce the blade. The development work had gone quite far
when we were approached by Erik Grove-Nielsen who politely and
quite correctly pointed ...