4.2. Programmatic Recovery Checklist

Table 4-1 is the Programmatic Recovery Checklist. Use this table to find and isolate a problem in the programmatic part of your project. The Programmatic Performance Checklist is presented in Chapter 2 of this book.

Table 4-1. Programmatic Recovery Checklist
1STATEMENT OF WORK (SOW)RecoveryYes
1a (NO)The SOW was not properly defined59 
1b (NO)The SOW is not within our capabilities60 
1c (NO)The SOW was not properly interpreted62 
1d (NO)The SOW was not properly negotiated64 
1e (NO)The SOW is not being properly monitored65 
1f (NO)The SOW is not being performed properly66 
2SPECIFICATIONRecoveryYes
2a (NO)The Specification was not properly defined67 
2b (NO)The Specification is not within our capabilities69 
2c (NO) ...