Chapter 34. Statistical Process Control

Where Am I in the Process? Where Do I Apply QFD Within the Roadmaps?

Linkage to the I2DOV Technology Development Roadmap:

Image

SPC is used in increasing amounts during the Develop, Optimize, and Verify phases of I2DOV. It is seldom used during the Innovate phase.

Linkage to the CDOV Product Development Roadmap:

Image

SPC is used in increasing amounts during the Design, Optimize, and Verify phases of CDOV. It is seldom used during the Concept phase.