2Documents

2.1 Documents are central to the success of all building operations, even to small projects such as those carried out under MW16. In fact, with many small jobs on a short programme and tight budget, full and accurate information is essential right from the outset.

Tendering

2.2 It cannot be overemphasised that, when a project is sent out to tender, the contractor should be given full and detailed information regarding the project requirements. This is the principal means by which a designer can ensure that the quality of detailing, finish and workmanship will reach the required standards. If the project is not to be fully designed by the employer’s consultants, the contractor will require full information about the design that it ...

Get Guide to JCT Minor Works Building Contract 2016 now with O’Reilly online learning.

O’Reilly members experience live online training, plus books, videos, and digital content from 200+ publishers.