Appendix A: Specimen activity schedule

Example of priced activity schedule, adapted from SBCSub/G

Mechanical services 
 A Heating installation 235,000.00 
 B Hot water installation 6,000.00 
 C Cold water installation including rising main and tank 14,000.00 
 D Gas installation 2,500.00 
 E Mechanical ventilation 25,000.00 
 F Controls and wiring 9,000.00 
 G Testing and commissioning 3,000.00 
 H As-installed record drawings 1,500.00 
 J Operation and maintenance manuals 1,000.00 
 
 £297000.00
Electrical services 
 A Distribution boards, switchgear and sub mains cabling 28,000.00 
 B Power installation 72,000.00 
 C Lighting installation including fittings 92,000.00 
 D Fire alarm system 14,500.00 
 E Security system 6,000.00 
 F Earthing and bonding 5,000.00 
 G Testing and certification 2,500.00 
 H As-installed record drawings 1,250.00 
 J Operation and maintenance manuals 750.00 
 
 £222,000.00