Appendix A: Specimen activity schedule

Example of priced activity schedule, adapted from SBCSub/G

Mechanical services 
 A Heating installation 235,000.00 
 B Hot water installation 6,000.00 
 C Cold water installation including rising main and tank 14,000.00 
 D Gas installation 2,500.00 
 E Mechanical ventilation 25,000.00 
 F Controls and wiring 9,000.00 
 G Testing and commissioning 3,000.00 
 H As-installed record drawings 1,500.00 
 J Operation and maintenance manuals 1,000.00 
 
 £297000.00
Electrical services 
 A Distribution boards, switchgear and sub mains cabling 28,000.00 
 B Power installation 72,000.00 
 C Lighting installation including fittings 92,000.00 
 D Fire alarm system 14,500.00 
 E Security system 6,000.00 
 F Earthing and bonding 5,000.00 
 G Testing and certification 2,500.00 
 H As-installed record drawings 1,250.00 
 J Operation and maintenance manuals 750.00 
 
 £222,000.00
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.
Start your free trial

You might also like

Guide to RIBA Professional Services Contracts 2018

Guide to RIBA Professional Services Contracts 2018

Ian Davies

Publisher Resources

ISBN: 9781000703061