Establishing your project team
How has the role of the contractor altered?
Has the role of the design team altered over the years?
How do these changing roles impact the RIBA Plan of Work?
Chapter 1 highlighted the fact that the first RIBA Plan of Work published in 1963 was a ‘Plan of Work for Design Team Operations’. One aspect in the evolutionary development of the RIBA Plan of Work 2013 is acknowledging the cultural shift from the design team to the project team. Before considering the subtle differences between these two teams it is important to examine why this shift has occurred:
- • Clients vary: some have not interfaced with ...