2.2.1 Overview of the available frames
For the Cluster 1600, RS/6000 SP internal nodes and SP Switch/SP Switch2
several frames are available to fit the needs of the desired configuration. A quick
summary shows the available frames and their description:
7040-T00 19-inch system rack containing p630 (7028-6C4) or p660
(7026-6xx) servers or I/O drawers
7040-T42 19-inch system rack containing p630 (#7028) or p660 (#7026)
servers or I/O drawers
7040-W42 24-inch system frame containing p655 servers (#7039-651) or I/O
drawers
9076-550 SP frame containing nodes or nodes and switch, including
expansion frame (F/C 1550)
9076-55H SP frame containing nodes or nodes and switch (administrative
field conversion of legacy 79-inch model frame), including expansion frame
(F/C 1550)
9076-555 SP Cluster Switch Frame, which can contain up to one SP Switch
9076-556 SP Switch2 Frame, which can contain up to eight SP Switch2s
9076-557 SP Switch Model for 19-inch rack, which can contain up to one SP
Switch
9076-558 SP Switch2 Model for 19-inch rack, which can contain up to two SP
Switch2s
Model 550 - a 1.93m frame
With eight empty node drawers for either eight wide nodes, 16 thin nodes, or
four high nodes
A 10.5 kW, three-phase SEPBU power subsystem
Model 555 - a 1.93m SP Switch frame
This frame provides switch ports for Cluster 1600 systems of two to 16 logical
nodes. For configurations of 17 to 32 nodes, you need to add an SP expansion
frame (F/C 1555) containing one SP Switch.
With one SP Switch node switch board, F/C 4011
A 10.5 kW, three-phase SEPBU power subsystem
Model 556 - a 2.01m SP Switch2 frame
The Model 556 and F/C 2034 share the 79 in./2.01m frame and covers of the