Planning considerations for CPC in PR/SM mode
This chapter describes the following scenarios for planning and configuration of an IBM z14 Model ZR1 server by using traditional tools (CPC in PR/SM mode):
•Upgrading or migrating and existing configuration to a z14 ZR1
•Installing a new z14 ZR1
Dynamic Partition Manager: For more information about planning and configuration for a CPC by using Dynamic Partition Manager, see Chapter 16, “Configuring a z14 ZR1 server by using Dynamic Partition Manager” on page 387.
|