
Chapter 8. Introduction to Workload Simulator 287
Figure 8-5 WTM’s Add New Testcase panel
As an example, we will go through with Option 1. In this walkthrough, we will use
IDC to capture the following process:
1. Connect to the CICS region C001.
2. Go to the CICS native mode.
3. Start the Debug Tool transaction DTCN to view the default values.
4. End the DTCN transaction.
5. Start the sign-off transaction CESF.
6. Return to the C001 entry panel by pressing the Break key.
We start the process of the new testcase from the following panel, as shown in
Figure 8-6.