Engineering Management for Marine Structures
Chapter two is discussing the managing the design of the offshore structure projects. The way of controlling the design phase and the life cycle for this type of projects. The cost estimate for engineering phase and the project as a whole is presented in this chapter. This chapter provide a check list for each type of structure analysis will be done.
Keywords
Check list; cost estimate; time plan; engineering; FEED; total cost; concept; detail; structure; piping
2.1 Overview of field development
Offshore structures have special economic and technical characteristics. So managing this type of project needs some special skills and an overview of all projects phases. Economically, offshore structures are ...