September 2014
Intermediate to advanced
456 pages
12h 30m
English
Chapter two is discussing the managing the design of the offshore structure projects. The way of controlling the design phase and the life cycle for this type of projects. The cost estimate for engineering phase and the project as a whole is presented in this chapter. This chapter provide a check list for each type of structure analysis will be done.
Check list; cost estimate; time plan; engineering; FEED; total cost; concept; detail; structure; piping
Offshore structures have special economic and technical characteristics. So managing this type of project needs some special skills and an overview of all projects phases. Economically, offshore structures are ...
Read now
Unlock full access