15.7. Detail design & engineering documents

15.7.1. Documents mutually explanatory

The several documents forming the Contract are to be taken as mutually explanatory. In case of discrepancies between the several documents forming the Contract, precedence shall take place in the order designated in the Contract. Any ambiguities in the documents and/or drawings shall be referred to the Engineer for correct interpretation.
• Produce the required copies of maintenance schedule for each unit of the plant. This schedule shall state routine inspection and maintenance requirements during operation, routine shutdowns, and general overhauls. Schedules shall be in English and in a format agreed with the Company. The schedule shall give the timing and outline ...