Chapter 7. Advanced GDI+ Operations

Advanced GDI+ Operations

The fifth iteration of the construction phase is an extension of the existing GDI+ features that were implemented in the preceding iteration. For that reason, the deliverables are similar to the ones described in Chapter 6.

The go/no-go criteria for this iteration are essentially the same as the ones described in Chapter 6. The only difference is that the deliverables reflect the features that need to be implemented in this iteration. Here is the list of deliverables:

  • RequirementsUncover any requirements that have been missed and refine the requirements that are implemented in this iteration.

  • AnalysisAnalyze ...