Chapter 6Full-Length Practice Exam 3
The process names, inputs, tools and techniques, outputs, and descriptions of the project management process groups and related materials and figures in this chapter are based on content from A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Sixth Edition (PMI®, 2017). |
-
Using the following three-point estimates, calculate the expected value using the beta distribution formula: Optimistic = 25, Pessimistic = 50, Most Likely = 35.
- 25
- 36
- 35
- 37
-
Tom is a project manager working for a reputable editorial agency specializing in exam preparation. As part of his latest project, ...