O'Reilly logo

Power Over Ethernet Interoperability Guide by Sanjaya Maniktala

Stay ahead with the world's most comprehensive technology and business learning platform.

With Safari, you learn the way you learn best. Get unlimited access to videos, live online training, learning paths, books, tutorials, and more.

Start Free Trial

No credit card required

Template for Testing during PoE Design Qualification Phase
Here are some simple recommendations for testing surge reliability during the qualification phase. This particular test regimen was actually implemented by at least one high-profile switch manufacturer, who later reported good correlation with increased field reliability.
Test Level 1
Pass ±1 kV (1.2/50 μs; 8/20 μs) with 42-Ω surge impedance. With 1 min (or less) between successive zaps, apply 10 positive zaps followed by 10 negative zaps. Note that in terms of number of zaps, this is more severe than the mandatory-minimum requirement of 5-positive and 5-negative zaps (as per EN 61000-4-5 and EN 55022).
Test Level 2
Increase the surge voltage in steps of 200 V. Eventually pass ±2 ...