Process Plants

Book description

In the process industry, shutdown and turnaround costs are responsible for an excessive amount of maintenance expenses. Process Plants: Shutdown and Turnaround Management explores various types of shutdowns, presents recommendations for better management, and offers feasible solutions to help reduce overheads. Because turnaround management is the largest maintenance activity, plant turnaround is the focal point of this text. The book details a plan to lengthen the interval between turnarounds, and curtail costs in process production management by at least 30 percent.

This practical guidebook provides a thorough study of shutdown management, discusses different types of shutdown and managing events (emergency, unplanned, planned, and turnaround), and covers all aspects of plant turnaround management including startup, shutdown, and maintenance. It describes the five phases of shutdown management—initiating, planning, executing, controlling, and closing. It contains specific principles and precautions for successful shutdown planning, and highlights many aspects including turnaround philosophy, planning and scheduling, estimation, contractor management, execution, safety management, managing human resources, and post shut down review.

Process Plants: Shutdown and Turnaround Management

also includes topical information that readers can successfully apply to future shutdown projects. It is suitable for industry professionals and graduate students.

Table of contents

  1. Front Cover (1/2)
  2. Front Cover (2/2)
  3. Contents (1/2)
  4. Contents (2/2)
  5. Preface
  6. Disclaimer
  7. Acknowledgments
  8. Author
  9. Chapter 1: Introduction (1/4)
  10. Chapter 1: Introduction (2/4)
  11. Chapter 1: Introduction (3/4)
  12. Chapter 1: Introduction (4/4)
  13. Chapter 2: Initiating the Turnaround (1/2)
  14. Chapter 2: Initiating the Turnaround (2/2)
  15. Chapter 3: Planning (1/6)
  16. Chapter 3: Planning (2/6)
  17. Chapter 3: Planning (3/6)
  18. Chapter 3: Planning (4/6)
  19. Chapter 3: Planning (5/6)
  20. Chapter 3: Planning (6/6)
  21. Chapter 4: Estimating (1/2)
  22. Chapter 4: Estimating (2/2)
  23. Chapter 5: Shutdown Contract Management (1/5)
  24. Chapter 5: Shutdown Contract Management (2/5)
  25. Chapter 5: Shutdown Contract Management (3/5)
  26. Chapter 5: Shutdown Contract Management (4/5)
  27. Chapter 5: Shutdown Contract Management (5/5)
  28. Chapter 6: Shutdown Organization (1/2)
  29. Chapter 6: Shutdown Organization (2/2)
  30. Chapter 7: Executing the Shutdown (1/2)
  31. Chapter 7: Executing the Shutdown (2/2)
  32. Chapter 8: Preshutdown Job (1/4)
  33. Chapter 8: Preshutdown Job (2/4)
  34. Chapter 8: Preshutdown Job (3/4)
  35. Chapter 8: Preshutdown Job (4/4)
  36. Chapter 9: Inspection of Equipment (1/3)
  37. Chapter 9: Inspection of Equipment (2/3)
  38. Chapter 9: Inspection of Equipment (3/3)
  39. Chapter 10: Shutdown Safety (1/5)
  40. Chapter 10: Shutdown Safety (2/5)
  41. Chapter 10: Shutdown Safety (3/5)
  42. Chapter 10: Shutdown Safety (4/5)
  43. Chapter 10: Shutdown Safety (5/5)
  44. Chapter 11: Communication Package (1/2)
  45. Chapter 11: Communication Package (2/2)
  46. Chapter 12: Shutdown Control (1/2)
  47. Chapter 12: Shutdown Control (2/2)
  48. Chapter 13: Quality Plan (1/2)
  49. Chapter 13: Quality Plan (2/2)
  50. Chapter 14: Risk in Shutdown (1/2)
  51. Chapter 14: Risk in Shutdown (2/2)
  52. Chapter 15: Joint Integrity (1/2)
  53. Chapter 15: Joint Integrity (2/2)
  54. Chapter 16: Commissioning (1/5)
  55. Chapter 16: Commissioning (2/5)
  56. Chapter 16: Commissioning (3/5)
  57. Chapter 16: Commissioning (4/5)
  58. Chapter 16: Commissioning (5/5)
  59. Chapter 17: Postshutdown Review (1/3)
  60. Chapter 17: Postshutdown Review (2/3)
  61. Chapter 17: Postshutdown Review (3/3)
  62. Chapter 18: Performance (1/2)
  63. Chapter 18: Performance (2/2)
  64. Appendix A: Pressure Ratings of Steel Pipe (1/2)
  65. Appendix A: Pressure Ratings of Steel Pipe (2/2)
  66. Appendix B: Gaskets (1/4)
  67. Appendix B: Gaskets (2/4)
  68. Appendix B: Gaskets (3/4)
  69. Appendix B: Gaskets (4/4)
  70. Appendix C: Scaffolding (1/2)
  71. Appendix C: Scaffolding (2/2)
  72. Appendix D: Crane and Its Load Chart
  73. Appendix E: Shell and Tube Heat Exchangers (1/5)
  74. Appendix E: Shell and Tube Heat Exchangers (2/5)
  75. Appendix E: Shell and Tube Heat Exchangers (3/5)
  76. Appendix E: Shell and Tube Heat Exchangers (4/5)
  77. Appendix E: Shell and Tube Heat Exchangers (5/5)
  78. Appendix F: Dimension of Flanges and Fittings (1/16)
  79. Appendix F: Dimension of Flanges and Fittings (2/16)
  80. Appendix F: Dimension of Flanges and Fittings (3/16)
  81. Appendix F: Dimension of Flanges and Fittings (4/16)
  82. Appendix F: Dimension of Flanges and Fittings (5/16)
  83. Appendix F: Dimension of Flanges and Fittings (6/16)
  84. Appendix F: Dimension of Flanges and Fittings (7/16)
  85. Appendix F: Dimension of Flanges and Fittings (8/16)
  86. Appendix F: Dimension of Flanges and Fittings (9/16)
  87. Appendix F: Dimension of Flanges and Fittings (10/16)
  88. Appendix F: Dimension of Flanges and Fittings (11/16)
  89. Appendix F: Dimension of Flanges and Fittings (12/16)
  90. Appendix F: Dimension of Flanges and Fittings (13/16)
  91. Appendix F: Dimension of Flanges and Fittings (14/16)
  92. Appendix F: Dimension of Flanges and Fittings (15/16)
  93. Appendix F: Dimension of Flanges and Fittings (16/16)
  94. Back Cover

Product information

  • Title: Process Plants
  • Author(s): Trinath Sahoo
  • Release date: October 2013
  • Publisher(s): CRC Press
  • ISBN: 9781466517349