CHAPTER 15
Note to the Instructor: Some of the control charts and control chart summaries were created using Statgraphics. Minitab can be used to provide similar results.
Section 15-3
15-1 a)
chart
UCL = CL + A2 = 223+ 0.577(34.286) = 242.78CL = 223LCL = CL − A2 = 223−0.577(34.286) = 203.22
R chart
UCL = D4 = 2.115(34.286) = 72.51CL = 34.286LCL = D3 = 0(34.286) = 0
b) = = 223
15-3 a)
b) Process mean and standard deviation
15-5 a)
For the chart:UCL = + A2 = 4.6677 ...