6Time‐Boxing, Kanban, and Theory of Constraints

THE TYPICAL WAY OF MODELING classical plan‐driven projects is based on a fairly statically defined model composed of work‐breakdown structures, PERT charts, Gantt charts, etc. Figure 6.1 shows an example Gantt chart and Figure 6.2 shows an example Pert chart.

Those modeling tools work fine for a heavily plan‐driven approach where the requirements as well as the overall design approach for meeting those requirements can be defined prior to the start of the project. However, they can be very difficult or impractical to apply in a more dynamic and adaptive project approach where the requirements are much more uncertain and difficult to define upfront. In that kind of project, it is very difficult and perhaps impractical to define and manage the structure of the project, and it becomes far more important to manage flow.

Schematic illustration of Example Gantt chart

FIGURE 6.1 Example Gantt chart

Schematic illustration of Example PERT chart

FIGURE 6.2 Example PERT chart

THE IMPORTANCE OF FLOW

Agile Project Management approaches are heavily based on a more dynamic model and on optimizing flow in order to maximize the efficiency and the throughput of the project team rather than statically managing the structure of the project tasks to achieve control and predictability.

  • The idea of flow originated with Lean Manufacturing ...