Chapter 4. Using Tivoli Storage Productivity Center for Replication with DS8000 265
Planned outage of Site 2 storage systems
In this scenario, we consider a planned maintenance activity that requires powering off the
SIte 2 storage systems. During the maintenance activity, all of the Disaster Recovery
capabilities must be active. We also describe the go-back procedure to return to the original
configuration. The flow of the Tivoli Storage Productivity Center for Replication operations is
shown in Figure 4-119.
Assuming that the host operations are running on Site 1, we can complete the following steps:
1. Start a StartH1 H3 action on the Tivoli Storage Productivity Center for Replication
session. This starts the Global Mirror from Site 1 to Site 3 and performs the following
operations:
– Freeze H1-H2 pairs
– Failover I3 volumes
– Stop the H2-H3 Global Mirror session
– Remove the H1-H2 pairs
– Start H1-I3 pairs with the Incremental Resync with option
recover
– Wait until the H1-I3 first pass copy is completed
– Start the Global Mirror H1-H3
Figure 4-119 Site 2 planned outage state transition diagram
Now we can proceed with powering off the storage systems in Site 2. Tivoli Storage
Productivity Center for Replication alerts you about the communication loss to Site 2
storage systems, but this does not affect the current configuration. After the maintenance
is completed and the Site 2 storage systems are running again, we can start the
procedure return to the original configuration.
2. Start a StartH1 H2 H3 action on the Tivoli Storage Productivity Center for
Replication session. This performs the following operations:
– Failback I3 volumes to H2 volumes
– Wait until the I3-H2 first pass copy is completed
– Enable the Incremental Resync from H1 and I3 with noinit option
– Suspend the Global Copy pairs H1-I3
– Wait until the I3-H2 copy is completed (100% copied)
– Failover H2 volumes
– Failback H2 volumes to I3 volumes
– Start H1-H2 pairs with the Incremental Resync with option override
– Wait until the H2-I3 first pass copy is completed
– Start the Global Mirror H2-H3
The go-back procedure is then completed and the normal operation configuration is restored.
None of these procedures required a full copy of the data.