February 2024
Intermediate to advanced
322 pages
9h 36m
English
Ramez Abdalla* and Philip Jaeger
Clausthal University of Technology , Clausthal, Germany.
Proper estimation of multiphase flowrates in oil and gas production systems is an essential tool of monitoring and optimising the production systems. Hence, one of the routine tests of wells is production testing. It is usually conducted as a schedulable test to monitor liquid rates, water cuts, and gas oil ratio (GOR). The production testing is easily conducted using the test separator to compare the actual production rate with the theoretical one. It is the most common form of production and reservoir surveillance. ...
Read now
Unlock full access