Change control management is an integral part of the success for a project. A goal of integrated change control is to make sure that product scope changes are reflected in the project scope definition. What is a useful tool or technique that can be used to aid integrated change control?
| |
Sarah has been assigned to a high-profile project with several strong personalities that want to expand the scope of her project. She realizes that minimizing scope creep through change control can have a positive impact upon the timeline for the project. Which of the following is an input to integrated change control?
|