Test Plan IdentifierIntroductionTest Objects or ItemsFeatures to Be TestedFeatures Not to Be TestedTest Approach or StrategyAcceptance Criteria (Test Item Pass/Fail Criteria)Suspension Criteria and Resumption RequirementsTest Documentation and DeliverablesTesting TasksTest Infrastructure and Environmental NeedsResponsibilities and AuthorityStaffing and Training NeedsScheduleRisks and ContingenciesApprovalGlossary (not in IEEE829-1998, but lower case!)Test Plans According to IEEE Standard 829-2008The Master Test PlanMaster Test Plan Identifier1. Introduction1.2 Scope1.3 References1.4 System Overview and Key Features1.5 Test overview1.5.1 Organization1.5.2 Master Test Schedule1.5.3 Integrity Level Scheme1.5.4 Summary of Necessary Resources1.5.5 Responsibilities and Authority1.5.6 Tools, Techniques, Methods, and Metrics2. Details of the Master Test Plan2.1 Test Processes, Including Definition of Test Levels2.1.1 through 2.1.6 “Life cycle” Processes, i.e., Activities and Tasks2.2 Test Documentation Requirements2.3 Test Administration Requirements2.3.1 Anomaly (defect) Resolution and Reporting2.3.2 Task Iteration Policy2.3.3 Deviation Policy2.3.4 Control Procedures2.3.5 Standards, Practices, and Conventions2.4 Test Reporting Requirements3. General3.1 Glossary3.2 Document Change Procedures and HistoryThe Level Test PlanThe template from the standardGuidance for section 3.4Guidance for sections 4.1 through 4.34.1 Quality assurance procedures4.2 Metrics4.3 Test coverage