Once the fault position has been located, power is removed from the system.
The cable ship then deploys a suitable type of grapnel and undertakes a grapnel
run on the cable at some distance before the fault position. If possible, a cut-and-
hold grapnel is deployed so that the cable can be cut and recovered as one
exercise. If this is not possible, a cutting grapnel is used first and a second grapnel
run, separated from the first by a distance equivalent to the water depth, is used to
recover the cable.
Once the holding g rapnel is engaged with the cable, which will be indicated
by a rise of observed tension on the grapnel holding rope, the cable is