O'Reilly logo

Advances in Communications-Based Train Control Systems by F. Richard Yu

Stay ahead with the world's most comprehensive technology and business learning platform.

With Safari, you learn the way you learn best. Get unlimited access to videos, live online training, learning paths, books, tutorials, and more.

Start Free Trial

No credit card required

xiii
List of Tables
Table 1.1 Radio-Based CBTC Projects around the World .................................9
Table 3.1 Advantages and Disadvantages of NDT Methods for Rail and
Fastening Parts Inspection ...............................................................58
Table 3.2 Comparison of NDT Methods for Rail and Fastening Parts ...........61
Table 4.1 Notions of Symbols ..........................................................................71
Table 4.2 resholds of SNR Levels (Four Levels) at the Location of
100m for Dierent Intervals ...........................................................76
Table 4.3 resholds of SNR Levels (Eight Levels) at the Location
of100mfor Dierent Intervals ...................................................... 77
Table 4.4 State Transition Probabilities of the FSMC
ModelandtheMeasurement Data with Four States and 5 m
Interval attheLocation(3540 m) ................................................. 77
Table 6.1 Parameters Used in Numerical Examples.......................................110
Table 7.1 Main Notations..............................................................................118
Table 7.2 Simulation Parameters ...................................................................139
Table 8.1 Simulation Parameters ...................................................................168
Table 9.1 reshold of the Mean Envelope Power at Certain Possibilities
(σ
Ω
= 8 dB) .................................................................................... 189
Table 9.2 reshold of the Envelope Power at Certain Probabilities .............. 189
Table 9.3 Parameters for AP Coverage Plan ...................................................190
Table 9.4 Parameters to Analyze the Rate of Packet Drops
IntroducedbyHandovers ..............................................................193
Table 9.5 Field Test Results on the Rate of Packet Drops Introduced by
Handovers ......................................................................................201
xiv List of Tables
Table 9.6 Simulation Parameters .................................................................202
Table 9.7 LMI Feasibility of the System Using Current Control Scheme
(T = 0.3 s) ................................................................................... 204
Table 10.1 Availability under Dierent Policies .............................................235
Table 10.2 Parameters Used in the Simulations .............................................242

With Safari, you learn the way you learn best. Get unlimited access to videos, live online training, learning paths, books, interactive tutorials, and more.

Start Free Trial

No credit card required