Skip to Content
Cable System Transients
book

Cable System Transients

by Akihiro Ametani, Teruo Ohno, Naoto Nagaoka
August 2015
Intermediate
550 pages
11h 8m
English
Wiley-IEEE Press
Content preview from Cable System Transients

Chapter 8Cable Transient in Distributed Generation System

Naoto Nagaoka

Graduate School of Electrical Engineering, Doshisha University, Kyoto, Japan

Some examples of transient simulations of cable systems in distributed generation systems by means of the electromagnetic transients program (EMTP) [1] will be given in this chapter.

8.1 Transient Simulation of Wind Farm

8.1.1 Circuit Diagram

Figure 8.1 illustrates a model circuit of a wind farm. Each feeder involves five wind generators. The generator of capacity 3 MW and its step-up transformer are assumed to be disconnected to focus on the transient characteristic of the cable system in the simulation. Each feeder is connected to a 22 kV bus in Substation L (s/s L). The buses have a bus-tie circuit breaker (CB) (SWC). The capacity of each transformer installed in Substation L is c08-math-0001. When the bus-tie CB is closed, the condition is identical to that where the feeders are connected to the 66 kV bus via a single transformer of capacity 36 MVA. The wind farm is connected with a grid at Substation K (s/s K). The backward impedance of the grid is represented by an RL series circuit. Node names used in the EMTP simulation are composed of the characters in dashed boxes in Figure 8.1 followed by a character indicating phase-A, B, or C.

c08f001
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.

Read now

Unlock full access

More than 5,000 organizations count on O’Reilly

AirBnbBlueOriginElectronic ArtsHomeDepotNasdaqRakutenTata Consultancy Services

QuotationMarkO’Reilly covers everything we've got, with content to help us build a world-class technology community, upgrade the capabilities and competencies of our teams, and improve overall team performance as well as their engagement.
Julian F.
Head of Cybersecurity
QuotationMarkI wanted to learn C and C++, but it didn't click for me until I picked up an O'Reilly book. When I went on the O’Reilly platform, I was astonished to find all the books there, plus live events and sandboxes so you could play around with the technology.
Addison B.
Field Engineer
QuotationMarkI’ve been on the O’Reilly platform for more than eight years. I use a couple of learning platforms, but I'm on O'Reilly more than anybody else. When you're there, you start learning. I'm never disappointed.
Amir M.
Data Platform Tech Lead
QuotationMarkI'm always learning. So when I got on to O'Reilly, I was like a kid in a candy store. There are playlists. There are answers. There's on-demand training. It's worth its weight in gold, in terms of what it allows me to do.
Mark W.
Embedded Software Engineer

You might also like

Current Interruption Transients Calculation, 2nd Edition

Current Interruption Transients Calculation, 2nd Edition

David F. Peelo
Undersea Fiber Communication Systems

Undersea Fiber Communication Systems

Jose Chesnoy, Govind Agrawal, Ivan Kaminow, Paul Kelly
Transient Analysis of Power Systems

Transient Analysis of Power Systems

Juan A. Martinez-Velasco

Publisher Resources

ISBN: 9781118702123