June 2019
Intermediate to advanced
160 pages
5h 36m
English
At Stage 3 the role of the contract administrator continues to be dependent on the procurement route selected at Stage 1.
During Stage 3 the Concept Design will be further developed through input from other members of the design team, to the point where a planning application could be made. There may be various iterations of the design during this period, but by the end of the stage the lead designer should have coordinated the scheme and arranged for it to be signed off by the client.
This chapter ...
Read now
Unlock full access